Prelia Cleanroom

PROJECT SEQUENCE

How a cleanroom project runs

Six stages. You can stop after any of them.

01

Site assessment

We visit, measure, and look at what is actually there. Ceiling void, power, drainage, access for materials.

02

Concept and classification

Zoning, airflow direction, pressure cascade and the target class per room, with the reasoning written down.

03

Scope and quotation

A scope split showing which party is responsible for which works, with pricing and a sequence.

How to choose a contractor →

04

Supply

Materials and equipment delivered to site against an agreed schedule.

05

Installation and coordination

Installation by the appointed CIDB-registered contractor, coordinated against your production calendar.

06

Testing and handover

Independent classification testing, documentation pack, and a walkthrough of maintenance access before you sign off.

See projects by facility type →

WHERE WE FIT

Not sure what to ask for?

We turn your process and floor plan into a scope document you can send out for pricing, then supply the systems that go into the room.

  • Classification and zoning defined against your product
  • Scope split written down before anyone quotes
  • Comparable pricing, because every bid prices the same document
Request a Site Assessment

NEXT STEP

Tell us the classification you need.

Send your floor area, target ISO class and process. We reply with a scope outline and an indicative range.