Cleanroom design and build in Malaysia, explained
Design and build puts one party in charge of both stages. It is faster, and it removes your ability to compare prices on the same drawing.
What the term means
Under design and build, one appointed party both designs the cleanroom and carries out the works. The alternative is to have the design done first, then put that finished design out to several parties for pricing.
How the two compare
| Design and build | Design, then tender | |
|---|---|---|
| Speed | One appointment, faster start | Two stages, slower start |
| Price comparison | Hard, each bid prices a different design | Direct, every bid prices the same document |
| Where risk sits | With the single appointed party | Split between designer and installer |
| Design ownership | Held by the appointed party | Held by you |
| Suits | A layout you have built before | A first cleanroom, or a regulated product |
Which route suits you
If this is your first cleanroom, or the product is regulated, or the budget is tight enough that you need to compare prices properly, designing first and tendering second usually serves you better. If you are repeating a layout you have built before and the deadline is the binding constraint, a single appointment is worth the loss of price comparability. How to choose a contractor.
One thing does not change
Whichever route you take, the classification decision comes first and it belongs to you, not to whoever you appoint. It sets the air change rate, the air change rate sets the plant size, and the plant size sets a large part of both the capital cost and the running cost. Learn about classification.